Full Bathroom Installation
Top to bottom, suite to tiles
The full job — strip out the old bathroom, repair walls and floor, move plumbing and electrics to the new layout, fit the suite, tile the walls and floor, fit shower screens, accessories and trim. Most full bathrooms take 7-12 working days. Critically: we do the waterproofing properly. Tanking behind tiles in wet areas, sealed wall boards in showers, proper fall on shower trays. That's what stops a bathroom going mouldy in two years.
- Strip-out and disposal of old suite
- Bath, basin, toilet and shower fitting
- Wall and floor tiling
- Plumbing, electrics and extractor
- Waterproofing — tanking, sealed boards, proper falls